FULL ELECTRICAL FIT-OUT, BROMPTON BICYCLE, UNIT 16 GREENFORD


Turnkey electrical fit-out delivered from shell unit to move-in ready commercial space.

Commercial & Industrial Electrical


Electrical work delivered in active, secure environments.

A TRUSTED PARTNERSHIP


Brompton Bicycle has been handcrafting its iconic folding bikes at its Greenford factory since 1975.


Britain's largest bicycle manufacturer and a global brand sold in over 47 countries, they needed an electrical contractor who understood the demands of a live, high-output production environment.


BEC Electrical have been that contractor for nearly 20 years.

Empty warehouse interior featuring a white brick wall, metal siding, structural beams, a black door, and concrete floors.
A large, high-ceilinged warehouse interior with overhead industrial cable trays, construction equipment, and tools.

The Challenge


Unit 16 required complete electrical infrastructure delivered from scratch, with multiple trades on site and a fixed move-in date that couldn't move.

A simple, black lightning bolt icon on a white background.

SHELL TO COMPLETION

The unit was handed to BEC as an empty shell. Full electrical infrastructure design and installation was required from the ground up.

A black icon depicting a hierarchy or organizational chart with one top box branching down to two lower boxes.

MULTI TRADE COORDINATION

BEC were first on site and coordinated directly with other contractors to maintain smooth delivery across all workstreams.

A black calendar icon featuring a grid representing days on a white background.

PROGRAMME CRITICAL

The project had a fixed completion date. The client needed to move in and begin operations on time, with no room for delay.

Two black arrows pointing in opposite directions, one above the other, indicating a swap or exchange.

LATE STAGE CHANGES

Client-driven scope changes were requested during delivery. These were accommodated without pushing back the handover date.

The APPROACH


BEC led the project with a planning-first mindset, taking full design responsibility and managing coordination across all trades from start to finish.

An icon showing a pencil crossed over a ruler, representing drafting, design, or measurement.

DESIGN-LED DELIVERY

Complete electrical design was handled in-house, aligned to the building use and client requirements from day one.

A simple black-and-white line icon depicting two hands joined in a handshake.

TRADE COORDINATION

BEC worked directly alongside all site contractors, sequencing work to avoid clashes and keep the project moving.

A black, stylized lightning bolt icon.

FULL SCOPE PACKAGE

Lighting, power, distribution boards, data and fire alarm delivered as one complete, coordinated package.

A black shield-shaped icon featuring a white circular border and a white cross in the center.

HIGH LEVEL ACCESS

All high-level works were completed safely using trained subcontractors certified for scissor lift and access equipment operation.

The Result


An icon of a circular arrow pointing counter-clockwise around a clock face, symbolizing history or an undo action.

ON TIME, READY TO OCCUPY

Works were completed within the agreed timeframe. The client moved in on schedule and began operations immediately.

A black icon of a circular award badge with wavy edges and two dangling ribbons.

COMPLETE ELECTRICAL INSTALLATION

Every element of the electrical package was delivered by BEC, from initial design through to final handover.

A black circular icon featuring a clock face with hands pointing at approximately 1:20.

LATE CHANGES, NO DELAYS

Scope changes during delivery were absorbed and resolved without impact to the overall timeline.

A black clipboard icon with a checklist and a checkmark symbol in the bottom right corner.

FULL COMPLIANCE HANDOVER

O&M documentation prepared and handed over in full, ensuring the client had everything needed from day one.

Brompton London Logo
A pair of black, bold quotation marks.

We have used BEC Electrical for nearly 20 years during which time they have undertaken the electrical installation at two industrial units in Brentford before we moved in. We have also used them for the maintenance of our site electric circuits, and all the additional installation of power supplies, lighting and more as we have grown our production capacity from 5,000 to 45,000 bikes per annum over the 20 years.

Whenever we have had a breakdown condition BEC has always been very responsive to our needs, and when necessary have worked at weekends and occasionally overnight to minimise the impact on our production departments.

Greg Smith


Head of Facilities, Brompton Bicycle Ltd, Greenford

START YOUR PROJECT

Planning a project or require electrical support?
  Get in touch with BEC Electrical to discuss your requirements, request a quote or arrange an initial conversation with our team

Contact Us